Ramp Designer
New to jump building?
Use Help Me Choose to get a recommended setup based on your sport, skill level, jump feel, and airbag. You can still fine-tune the dimensions manually afterward.
Manual adjustments: change one value at a time and watch the preview, build summary, and airbag recommendation update. For beginners, start with smaller height and larger transition radius.
Current setup: 72″ height, 144″ transition radius, 60° takeoff
Download printable build plans with dimensions, cut notes, rib spacing, and assembly views.
Plan Views
Buildability
Recommended Use
Build Summary
Build Type: split-side
Lower panel (first 4×8, horizontal along curve): 88 11/16" (max 96")
Side Panels: 4 total side pieces
2x4 Ribs: 24 pieces at 46 1/2" (18 top + 6 support)
2x4x8 Boards: 12 estimated
3/4" Plywood: 3 sheets estimated
3/8" Plywood Skin: 2 sheets estimated
#10 2-1/2" Deck Screws: 96 (24 ribs x 4)
#8 1-5/8" Deck Screws (Top Skin Ribs): 72
1/2" x 4" Hex Head Bolts: 4
1/2" Washers: 8
1/2" Locking Nuts: 4
- 90 1/8"
- 17 7/16"
- 39 1/4"
Letters match the red callouts on the main drawing. Use these references in cut and layout instructions.
| Dim | Description | Value |
|---|---|---|
| A | Arc center → left panel edge | 12" |
| B | Height (lip to grade) | 72" |
| C | Toe (flat approach) | 8" |
| D | 1st side panel width (at grade) | 88 11/16" |
| E | 2nd side panel width (at grade) | 30" |
| F | Rib spacing, lower section (chord) | 7 15/16" |
| G | Top skin 3/8″, 1st panel — cut 1 | 90 1/8" |
| H | Top skin 3/8″, 1st panel — cut 2 | 17 7/16" |
| I | Top skin 3/8″, 2nd panel | 39 1/4" |
| J | Split-joint helper rib offset below panel edge | 6" |
| K | Top deck length (past lip) | 6" |
| L | Rib spacing, upper section (chord) | 7 9/16" |
| M | Takeoff angle at lip | 60.0° |
- See the Drawing dimension key above for lettered dimensions on the main drawing.
- Side profile needs lower and upper sections.
- Build lower and upper side assemblies separately, then join them using 1/2" bolts, washers, and locking nuts.
- Use the split position and section lengths to guide side cut planning.
Materials Estimate
2x4x8 boards (est.): 12(2x4 ribs at 46.5": 24 pieces — 18 top + 6 support)
3/4" plywood sheets: 3
3/8" plywood sheets: 2
#10 2-1/2" deck screws: 96 (24 ribs x 4)
#8 1-5/8" deck screws (top skin ribs): 72
1/2" x 4" hex head bolts: 4
1/2" washers: 8
1/2" locking nuts: 4
Tools & supplies
- Handheld circular saw or jigsaw
- Radial arm saw or chopsaw (optional, but nice to cut 2x4's)
- Measuring tape
- Pencil
- Safety glasses
- Hearing protection
- A friend
- Paint (optional)
- Grip tape or metal lath (optional)
Cost Estimator
Enter a unit cost for each item to estimate total material cost.